Last verified: .
Toronto: the current starting point
Open the official Toronto winter source ↗Toronto now clears about 98% of public sidewalks. When snowfall is under 2 cm, residents and businesses must clear adjacent sidewalks within 12 hours after the snowfall ends; at 2 cm or more, city crews clear public sidewalks.
A practical Toronto winter check
Use the storm end time only after confirming the municipality actually uses a fixed deadline. Then check parking events and the snow-placement rule independently.
On a corner lot, the side-street sidewalk can matter as much as the front. Businesses should verify whether the city applies a separate clearing expectation.
Why a two-centimetre storm changes the sidewalk rule
Toronto's current division of work depends on snowfall depth. For less than 2 cm, residents and businesses must clear the public sidewalk beside their property within 12 hours after the snowfall ends. At 2 cm or more, the City says it clears public sidewalks, now covering about 98 per cent of them. That is a service threshold, not permission to leave a private walkway, steps, ramp or access to a building icy. For a corner address, check both street frontages and the City service map before deciding which stretch a crew will reach. A snowfall that begins as a dusting and later accumulates past 2 cm also calls for checking the final event total rather than guessing from the first hour.
The legal starting point is Municipal Code Chapter 719, Snow and Ice Removal, section 719-2; the City's current property-clearing guidance explains how its sidewalk service and the under-2-cm responsibility operate today. Chapter 719 also provides for City work and cost recovery when a person fails a duty. Do not turn the City's target time for completing its own sidewalk rounds into a homeowner deadline. A storefront on a narrow downtown block may need a plan for the threshold case and for its private entrance even though a plow treats the public sidewalk during a larger storm.
Driveway openings and snow routes are different operations
Toronto offers driveway windrow openings on eligible streets, but it does not promise to clear every driveway. Its current winter service levels describe approximately three-metre openings on eligible residential roads. On eligible collector and arterial roads, the plow-created ridge must exceed 25 cm. The target is within two hours of road plowing, with route length, parked cars and storm size affecting delivery. Only windrows made by street plows qualify; a mound left by a private contractor or a sidewalk plow is a different problem. Keep the space in front of the driveway free of obstacles and check eligibility before assuming a crew will reopen it.
After an unusually large storm, snow may be loaded and hauled away rather than pushed again. A declared major snow event restricts parking on designated snow routes, concentrated downtown and including streetcar routes. Temporary orange no-parking signs separately control a road while snow removal is underway, even if the car was legally parked before crews arrived. The City's major-storm page and the sign at the actual curb should decide the parking question; a general citywide winter ban is not the same rule.
A Toronto enforcement example
Imagine a small snowfall stops overnight and a business leaves its adjacent sidewalk icy into the afternoon. The under-2-cm, 12-hour rule may be engaged, and an inspection can lead to City clearing and recovery of its costs under Chapter 719. In a larger storm, a different common ticket arises when a car remains on a marked streetcar snow route after a major snow event is declared, or beside a temporary orange removal sign. These are illustrations of enforceable situations, not reports of particular tickets. Photograph the condition, note the end of snowfall, and use the City's current event notice when evaluating a real case.
For an address on a narrow downtown street
Before a storm, find out whether your driveway is on a City windrow-opening route; many downtown laneway entrances are different from a driveway off a road. After the plow, check the road opening separately from the sidewalk and the private path to the door. If the City has declared a major snow event, a car on a streetcar snow route is exposed to a restriction even if a nearby local street is not. Snow loading may bring orange signs later, after routine plowing, so a driver should look again before leaving a car for the night. For a commercial tenant, ask the owner who treats the entrance threshold, since the City's public sidewalk pass cannot fix ice on private steps.
A 1-cm snowfall followed by freezing rain is precisely the case in which simply waiting for a municipal sidewalk plow can fail: the under-2-cm rule makes the adjacent resident or business responsible for that public walk. A 5-cm event changes the City service, but it does not make every property access City-maintained. If a contractor clears the walkway, record what it actually covered and when. When reporting a missed windrow opening, provide the street and driveway location and confirm it was a road-plow ridge, since only eligible windrows are covered. These distinctions prevent a service request about a laneway or privately created pile from being mistaken for a missed residential-road opening.
Official source
Page data snapshot updated September 22, 2026. Winter procedures are time-sensitive; verify the municipality’s live page during a storm.